Production Scheduling
Manufacturing scheduling expertise: bottlenecks, changeovers, TOC, SMED, OEE, and disruption response.
- What
- Manufacturing scheduling expertise: bottlenecks, changeovers, TOC, SMED, OEE, and disruption response.
- Cost
- Free
- Needs
- Use "Production Scheduling" with your Muse.
- Install
- Copy the installer prompt below into your Muse — your agent does the rest.
Curated by Skill Harbor: codified production-scheduling expertise from schedulers with 15+ years in discrete and batch manufacturing, framed as a senior-scheduler persona. Covers the fundamentals that MRP gets wrong (finite vs. infinite capacity, backward scheduling as the default), the Theory of Constraints with drum-buffer-rope (identify the true constraint by utilization ratio, protect it with time buffers monitored in green/yellow/red zones, subordinate every other decision to keeping the drum fed), changeover optimization (SMED phases from classifying setups to poka-yoke, sequence-dependent setup matrices, campaign vs. mixed-model economics), and bottleneck management (distinguishing true constraints from WIP pile-ups, detecting shifting bottlenecks by shift and product mix). Includes disruption response playbooks (machine breakdowns, material shortages, quality holds, absenteeism) with a re-sequencing framework and a 30-minute communication rule, dispatching rules (EDD, SPT, setup-aware EDD), OEE calculation with world-class targets, ERP/MES interaction patterns (SAP PP, Oracle, work order flow, plan adherence above 90%), escalation triggers, and per-shift KPIs. By @affaan-m, listed here with credit to its creator. From the affaan-m/ECC repository (the skill declares Apache-2.0). Honest caveats: pure guidance, nothing to install; manufacturing-domain expertise, most valuable with real shop-floor context (lines, work centers, ERP data). Skill Harbor never reviews the code, review it yourself before use.
Version:
Install
Copy the install package below, then paste it into MuseWe automatically scan every listing and flag anything suspicious, but we can't review every line of community code. Here's how to check a build yourself before you install it.
Use "Production Scheduling" with your Muse. Prerequisites: the Muse app (mobile or web). Pure guidance skill, nothing to install. Your shop-floor context helps enormously: lines, work centers, current bottlenecks, ERP data (SAP PP, Oracle, Epicor) if you have it. 1. Open the skill: https://github.com/affaan-m/ECC/blob/main/skills/production-scheduling/SKILL.md and copy the full SKILL.md text. 2. Paste it into a chat with Muse and add: "Help me schedule [this week's work orders / this disruption]: lines [lines], constraint [work center], due dates [dates]." 3. Ask Muse to identify the true constraint first (utilization ratio, not just where WIP piles up), then sequence with the dispatching rule that fits your product mix. Tip: protect the constraint above everything. A minute lost at the bottleneck is a minute lost for the whole plant; a minute lost elsewhere often costs nothing. Safety: a skill is plain-text instructions; it runs nothing by itself. Treat its scheduling recommendations as expert input, not orders, and validate against your ERP/MES reality before acting. Never paste secrets into a chat, and review anything Muse proposes before it acts.
Saved to your recent installs. Find it anytime on /connect.
Questions
How do I install a build?
Every product page includes a copy-paste install prompt. Paste it into your Muse and it sets the build up for you — no manual configuration.
Where does my money go?
Straight to the seller. Skill Harbor never processes payments: checkout happens on the seller’s own page, usually Stripe.
What does the ✓ next to a creator’s name mean?
It means we confirmed the identity of the person behind the listing. It says nothing about the code itself — always check a build before installing it.